Project Sector: Pharmaceutical
Bristol Myers Squibb, B5.
Wirral, Merseyside
The refurbishment of 65,000 sq/ft, two storey vacant building into stability laboratories to control temperature and humidity for clinical trials on various products.
Project Team
- Main contractor: Hightown Construction
- MEP contractor: JD Engineering
Project Value
- MEP value: £1.5M
Project Services
- Above Ground Drainage
- Domestic Hot and Cold Water
- Deionised Water
- Heating
- Cooling
- Ventilation
- Containment
- Power and Data
- Lighting
- Fire Detection
- Security
- PV
The design philosophy was Fabric First, efficient services and renewable energy. Building 5 (B5) achieved an energy and performance certificate (EPC) Rating A+(-32) which places it as the fourth best rating EPC lodged on the day in the entirety of England and Wales.