Project Sector: Pharmaceutical

Fisherman’s Friends.

Fleetwood, Lancashire

Fit-out of new 3,000m² manufacturing and packaging facility to increase the current output of 5 billion lozenges per year.

Project Team

  • Main contractor: JVX Ltd
  • MEP contractor: J Fletcher (Engineers) Ltd

Project Value

  • MEP Value: £5.2M

Project Services

  • Above Ground Drainage
  • Domestic Hot and Cold Water
  • HEPA Filtration
  • Heat Recovery Ventilation
  • BMS
  • Containment
  • Power and Data
  • Access Control
  • Lighting
  • Fire Detection
  • Security

The project included the formation of 9 new ISO 8 class cells requiring temperature and humidity control together with cascade pressure differentials between open product cells, transient corridors and change facilities.

Hurstwood undertook the validation for the project including the preparation of the Installation Qualification (IQ) and the Operational Qualification (OQ) chronicling the Mechanical Services Installation sought for the premises and confirming that they were in accordance with Fishermans Friends requirements for production, storage and distribution of products.