Project Sector: Education
Kearsley Academy.
Bolton, Lanashire
New build 75,000 sq/ft, 900 student Academy over 2 floors specialising in mathematics and computing.
Project Team
- Main contractor: BAM Construction
- MEP contractor: Lorne Stewart
Project Value
- MEP value: £2.0M
Project Services
- Above Ground Drainage
- Domestic Hot and Cold Water
- CHP
- Gas Fired Boilers
- Heat Recovery Ventilation
- BMS
- Containment
- Power and Data
- Access Control
- Lighting
- Fire Detection
- Security
The Project included the design of a combined heat and power (CHP) system to feed the domestic hot water and a proportion of heating reducing CO2 emissions from regulated and unregulated energy by at least 10% through low carbon energy sources.