Project Sector: Commercial, Residential

Lightbody Street.

Merseyside

Lightbody Street is a landmark mixed-use development situated in Liverpool's evolving Ten Streets regeneration zone overlooking Everton FC's new Stadium.

Project Team

  • Main contractor: Eric Wright Construction
  • Architects: Tim Groom Architects

Project Value

  • MEP value: £40m

Project Services

  • Internal / External & Emergency Lighting
  • LV Distribution
  • Fire Alarm / Security / CCTV
  • Small Power / Data
  • LPHW Heating & Domestic Hot & Cold water utilising Vital Energy Heat Interface Units
  • Air Conditioning
  • MVHR Ventilation
  • Above Ground Drainage
  • Rainwater (to Blu-Roof catchment)
  • Sprinkler Co-Ordination
  • Part L Compliance (SAP’s / BRUKL & EPC’s)
  • Overheating assessments & mitigation
  • Full Revit / BIM Scheme

Combining modern residential units with ground-floor commercial spaces, the project was part of a wider initiative to revitalise a key part of the city through sustainable urban development.

Lightbody Street consisted of three main blocks providing 195 Homes including 67 1-bedroom apartments, 96 2-bedroom apartments and 22 3-bedroom apartments, with 10 townhouses.

Project Scope & Challenges

  • Design and delivery of full MEP services for a large-scale, mixed-use development.
  • Integration of modern services within a constrained site footprint and historically industrial setting.
  • Balancing energy efficiency with tenant comfort across both residential and commercial zones.
  • Co-ordination of MEP systems with architectural features and limited service voids.


Client Goals

  • Create high-quality homes that meet modern standards of comfort, efficiency, and environmental performance.
  • Deliver flexible commercial spaces ready for diverse occupancy.
  • Achieve compliance with latest building regulations and sustainability criteria.
  • Maximise long-term asset value through robust, low-maintenance systems.


Our Solution

  • Full MEP design and installation oversight, including:
    • Heating & Cooling: Centralised low-carbon heating solution delivered via HIU’s.
    • Ventilation: MVHR systems in residential units for improved air quality and efficiency.
    • Electrical Services: Power, lighting, containment and life safety systems across all areas.
    • Public Health: Domestic services, drainage, and water conservation measures.
  • Energy modelling to ensure compliance with SAP/SBEM and planning requirements.
  • BIM co-ordination to resolve interface issues early and streamline installation.


Timeline

  • Start: June 2022
  • Completion: August 2025


Results

  • Delivered a modern, fully serviced building.
  • Enhanced thermal and acoustic comfort for residents.
  • Reduced energy consumption through fabric-first design and efficient services.
  • Robust MEP infrastructure prepared for future low-carbon upgrades.

Please contact me regarding the Lightbody Street project, I would like to know more.

* Required information.