Project Sector: Commercial, Residential
Lightbody Street.
Merseyside
Lightbody Street is a landmark mixed-use development situated in Liverpool's evolving Ten Streets regeneration zone overlooking Everton FC's new Stadium.
Project Team
- Main contractor: Eric Wright Construction
- Architects: Tim Groom Architects
Project Value
- MEP value: £40m
Project Services
- Internal / External & Emergency Lighting
- LV Distribution
- Fire Alarm / Security / CCTV
- Small Power / Data
- LPHW Heating & Domestic Hot & Cold water utilising Vital Energy Heat Interface Units
- Air Conditioning
- MVHR Ventilation
- Above Ground Drainage
- Rainwater (to Blu-Roof catchment)
- Sprinkler Co-Ordination
- Part L Compliance (SAP’s / BRUKL & EPC’s)
- Overheating assessments & mitigation
- Full Revit / BIM Scheme
Combining modern residential units with ground-floor commercial spaces, the project was part of a wider initiative to revitalise a key part of the city through sustainable urban development.
Lightbody Street consisted of three main blocks providing 195 Homes including 67 1-bedroom apartments, 96 2-bedroom apartments and 22 3-bedroom apartments, with 10 townhouses.
Project Scope & Challenges
- Design and delivery of full MEP services for a large-scale, mixed-use development.
- Integration of modern services within a constrained site footprint and historically industrial setting.
- Balancing energy efficiency with tenant comfort across both residential and commercial zones.
- Co-ordination of MEP systems with architectural features and limited service voids.
Client Goals
- Create high-quality homes that meet modern standards of comfort, efficiency, and environmental performance.
- Deliver flexible commercial spaces ready for diverse occupancy.
- Achieve compliance with latest building regulations and sustainability criteria.
- Maximise long-term asset value through robust, low-maintenance systems.
Our Solution
- Full MEP design and installation oversight, including:
- Heating & Cooling: Centralised low-carbon heating solution delivered via HIU’s.
- Ventilation: MVHR systems in residential units for improved air quality and efficiency.
- Electrical Services: Power, lighting, containment and life safety systems across all areas.
- Public Health: Domestic services, drainage, and water conservation measures.
- Energy modelling to ensure compliance with SAP/SBEM and planning requirements.
- BIM co-ordination to resolve interface issues early and streamline installation.
Timeline
- Start: June 2022
- Completion: August 2025
Results
- Delivered a modern, fully serviced building.
- Enhanced thermal and acoustic comfort for residents.
- Reduced energy consumption through fabric-first design and efficient services.
- Robust MEP infrastructure prepared for future low-carbon upgrades.