Project Overview: Kearsley Academy, Bolton
New build 900 student academy over 2 floors specialising in mathematics and computing. Inclusion of a Combined Heat and Power (CHP) system to feed the domestic hot water and a proportion of the heating reducing the CO2 emissions from regulated and unregulated energy by at least 10% through low carbon energy sources.
Project Team
Client: Kearsley Academy
Main Contractor: BAM Construction
Architect: Taylor Young
M&E Contractor: Lorne Stewart
Quantity Surveyor: Bam Construction
BREEAM: Very Good
Project Value:
MEP Services: £2.0M
Services
VRF and Air Conditioning
Heat Recovery Air Handling Units
Combined Heating and Power
External Main Water and Fire Hydrant
AV – Soundfield Systems and Induction Loops
Fire Alarm, Security, Disabled Alarm and PA
Lighting, LV Power Systems
Lightning Protection
External Floodlighting to Games Area